Engineering

Vessel Calibrations

Calibration of Survey Vessel Gyro’s, GPS Antennas and confirm vessel offsets for pre and post Marine Offshore Surveys around North Island.

Gas Pipeline Survey Control

,

Establish survey control every 2 km along the major pipeline networks throughout the North Island. The survey marks are utilised to reference the Pipeline Inspection Equipment inertial navigation equipment, and provide reference points to enable accurate set out for maintenance work on the pipelines.

Broiler Farm Development

,

Engineering development plans for broiler farm construction optimising layout with earthwork requirements.
Prepare Land Use consents for District Council (dwellings, exceedance of vehicle movements, earthworks) and Regional Council consents for works adjacent to waterways, alteration of existing watercourses and/or installation of culverts.

Hori Street Countdown Supermarket

, ,

Commenced in 2014, Bland & Jackson have assisted the developers in Land Use and Subdivision Consent processes required for this project to proceed. Bland & Jackson have also attended to all set out survey work required for the construction of the supermarket

Gas Pipeline Maintenance

Pipeline reinstatement and maintenance survey work

Jean Sandel Retirement Village

Set out of infrastructure, roading and buildings for the Jean Sandel Retirement Village, Barrett Road, New Plymouth. Our team is currently working on the next stage of the village development at Barrett Road, New Plymouth

Todd Energy – McKee LPG Facility

Set out & Control of LPG facility for Todd Energy

Fonterra

,

Bland & Jackson Surveyors Ltd were employed to carry out topographic surveys, set out and as-built surveys associated with the works in preparing the Fonterra site in Hawera for the construction of a new Dry store and associated roading and rail access. This included stormwater installation, detention pond set out, volume calculations, railway line and […]